Switzerland’s Gotthard Base Tunnel Will Finally Open in June
Already recognized as one of the premier train systems in the world, the Swiss Rail System can easily make its claim as the finest once the Gotthard Base Tunnel opens on June 1st. It has taken 20 years at a cost of $10.3 billion and the lives of 8 men to create the world’s longest tunnel, a mind-boggling 35 miles long. 8,000 feet below the surface of the Alps, more than 2,000 workers excavated some 2 million truckloads of earth. The result is a tunnel where trains will travel over 150 miles per hour, shaving an hour off the current Milan to Zurich run, down to 2 hours and 50 minutes. It’s an incredible feat, especially when you consider the tracks are completely flat under the mountainous Alps. That’s what I call Swiss ingenuity.